ALL ITEMS OF MACHINERY INCLUDING PRIME MOVERS, INSTRUMENTS, APPARATUS AND APPLIANCES, CONTROL GEAR AND TRANSMISSION EQUIPMENT, AUXILIARY EQUIPMENT (INCLUDING THOSE REQUIRED FOR RESEARCH AND DEVELOPMENT PURPOSES, TESTING AND QUALITY CONTROL), AS WELL AS ALL COMPONENTS (WHETHER FINISHED OR NOT) OR RAW MATERIALS FOR THE MANUFACTURE OF THE AFORESAID ITEMS AND THEIR COMPONENTS, REQUIRED FOR THE INITIAL SETTING UP OF A UNIT, OR THE SUBSTANTIAL EXPANSION OF AN EXISTING UNIT, OF A SPECIFIED: (1) industrial plant, (2) irrigation project, (3) Power project, other than solar power plant or solar power project (4) mining project, (5) project for the exploration for oil or other minerals, and (6) Such other projects, other than solar power plant or solar power project, as the Central Government may, having regard to the economic development of the country notify in the Official Gazette in this behalf; and spare parts, other raw materials (including semi-finished material) or consumable stores not exceeding 10% of the value of the goods specified above provided that such spare parts, raw materials or consumable stores are essential for the maintenance of the plant or project mentioned in (1) to (6) above
| HSN code | Description | Unit | Basic customs duty | IGST | |
|---|---|---|---|---|---|
| 9801 00 11 | MachineryFor industrial plant project | kg. | 7.5% | 18% | Duty → |
| 9801 00 12 | MachineryFor irrigation plant | kg. | 7.5% | 18% | Duty → |
| 9801 00 13 | MachineryFor power project, other than solar power plant or solar power project | kg. | 7.5% | 18% | Duty → |
| 9801 00 14 | MachineryFor mining project | kg. | 7.5% | 18% | Duty → |
| 9801 00 15 | MachineryProject for exploration of oil or other minerals | kg. | 7.5% | 18% | Duty → |
| 9801 00 19 | MachineryFor other projects, other than solar power plant or solar power project | kg. | 7.5% | 18% | Duty → |
| 9801 00 20 | All items of machinery including prime movers, instruments, apparatus and appliances, control gear and transmission equipment, auxiliary equipment (including those required for research and development purposes, testing and quality control), as well as all components (whether finished or not) or raw materials for the manufacture of the aforesaid items and their components, required for the initial setting up of a unit, or the substantial expansion of an existing unit, of a specified: (1) industrial plant, (2) irrigation project, (3) # power project,other than solar power plant or solar power project (4) mining project, (5) project for the exploration for oil or other minerals, and (6) such other projects, other than solar power plant or solar power project as the Central Government may, having regard to the economic development of the country notify in the Official Gazette in this behalf; and spare parts, other raw materials (including semi-finished materials of consumable stores) not exceeding 10% of the value of the goods specified above, provided that such spare parts, raw materials or consumable stores are essential for the maintenance of the plant or project mentioned in (1) to (6) aboveComponents (whether or not finished or not) or raw materials for the manufacture of aforesaid items required for the initial setting up of a unit or the substantial expansion of a unit | kg. | 7.5% | 18% | Duty → |
| 9801 00 30 | All items of machinery including prime movers, instruments, apparatus and appliances, control gear and transmission equipment, auxiliary equipment (including those required for research and development purposes, testing and quality control), as well as all components (whether finished or not) or raw materials for the manufacture of the aforesaid items and their components, required for the initial setting up of a unit, or the substantial expansion of an existing unit, of a specified: (1) industrial plant, (2) irrigation project, (3) # power project,other than solar power plant or solar power project (4) mining project, (5) project for the exploration for oil or other minerals, and (6) such other projects, other than solar power plant or solar power project as the Central Government may, having regard to the economic development of the country notify in the Official Gazette in this behalf; and spare parts, other raw materials (including semi-finished materials of consumable stores) not exceeding 10% of the value of the goods specified above, provided that such spare parts, raw materials or consumable stores are essential for the maintenance of the plant or project mentioned in (1) to (6) aboveSpare parts and other raw materials (including semi-finished materials or consumable stores for the maintenance of plant or project | kg. | 7.5% | 18% | Duty → |
Basic customs duty: the tariff rate in the First Schedule to the Customs Tariff Act, 1975, with Finance Act changes in force on 1 May 2026. IGST: the GST rate schedule in force on 1 Nov 2026. Exemption notifications can lower the basic duty, and anti-dumping duty may apply on top. How customs duty is worked out.
Chapter 98
Project imports; laboratory chemicals; passengers' baggage, personal importations by air or post; ship stores
Every heading in chapter 98 · The full HSN code list · Search by product
Sources
- CBIC: Customs Tariff of India, Part II, Import Tariff (First Schedule to the Customs Tariff Act, 1975), chapter files.
- Amendments to the First Schedule in the Finance (No. 2) Act, 2024, the Finance Act, 2025 and the Finance Act, 2026 (in force up to 1 May 2026).
- Notification No. 9/2025-Integrated Tax (Rate), as amended by Notifications 19/2025, 01/2026 and 02/2026, and the exemptions in Notification No. 10/2025-Integrated Tax (Rate) as amended by 03/2026.
Have us check the code before you order
Your sourcing partner checks the HSN code with the factory's specification, the exemptions and any anti-dumping duty, and quotes the order landed in India.